APPLICATION 03

Industrial Maintenance & Replacement

When an original drawing is unavailable, disciplined measurement, photos, sample handling and operating history can make a replacement discussion more useful.

01

Measure beyond the outline

Record thickness, cross-section, cut-outs, fastener locations, surface condition and where the part sits in the assembly. Note whether the old part was compressed, cracked, swollen or damaged.

  • Sample and dimension record
  • Failure mode and operating context
  • Required quantity and outage schedule
02

Approval before repeat supply

Replacement is a technical workflow, not a visual copy exercise. Confirm the intended use, validation route and acceptance criteria before calling a part interchangeable.

NoteLead time is confirmed only after the specification, samples, tooling and partner route are reviewed.